Land we hold.
Power we’ve secured.

Two sites in western Abu Dhabi, both with land rights in place and utility power approved: an AI compute campus we are developing ourselves, and a powered industrial plot available to an operator on a long-term lease.

Concept rendering of the Abu Dhabi AI Compute Campus
CONCEPT VISUALISATION · PHASE 1
HABSHAN · WESTERN ABU DHABI · OWN DEVELOPMENT

Abu Dhabi AI Compute Campus
10 MW

PHASE 1 IN DEVELOPMENT

A phased AI compute campus on more than 90,000 m² of industrial land in western Abu Dhabi. Approved utility power of 60 MW is developed as an initial 10 MW phase followed by a further 50 MW. Phase 1 is planned as 256 GPU servers delivered in four 64-server units, built from prefabricated modules with custom liquid cooling and separate heat rejection, and operated as dedicated capacity for identified customers.

POWER
10 MW initial phase · 60 MW approved
LAND
More than 90,000 m²
COMPUTE
256 GPU servers · 2,048 GPUs · four 64-server units
CONSTRUCTION
Prefabricated data centre modules, one server per liquid-cooled cabinet
COOLING
Closed-loop liquid cooling with dry heat rejection, designed for 50 °C ambient
PILOTS
Solar canopy for auxiliary loads · satellite backup connectivity
OUR ROLE

Developer and operator: land and power application, facility development, modular construction coordination, commissioning and campus operations.

Liquid-cooled server cabinets inside a data container under a solar canopy — concept rendering
CONCEPT · LIQUID-COOLED MODULE UNDER SOLAR CANOPY
Concept rendering of the fenced plot with the grid substation behind it
CONCEPT VISUALISATION
HABSHAN · AL DHAFRA · ABU DHABI · FOR LEASE

Habshan Powered Land
50 MW

AVAILABLE · LONG-TERM LEASE

Industrial land with an approved 50 MW power allocation and a licence covering cloud computing and cryptocurrency mining, offered on a long-term lease to a data centre, AI compute or mining operator. The plot lies near a 400/220/33 kV grid substation. The full 50 MW allocation is leased as a single block, with the land area agreed around the tenant’s layout.

POWER
50 MW approved allocation · single block, no subdivision
LAND
Up to 90,000 m² industrial land
LICENSED ACTIVITIES
Cloud computing services · cryptocurrency mining
GRID
Nearby 400/220/33 kV transmission substation
LEASE
Long-term: 5 years with an optional 5-year renewal
SITE STATUS
Not yet constructed · connection works coordinated with the tenant
OUR ROLE

Developer and lessor: coordinate the utility connection, approvals, site preparation and, where required, the facility build for the tenant.

Request the information pack↗

Figures are planning values taken from project documents and remain subject to utility approvals, surveys and definitive agreements. Images are concept renderings, not photographs of completed works.